Cloverleaf Infrastructure

Powered-land developer that secures utility power and delivers ready-to-build data center sites to developers and operators. Backed by NGP and Sandbrook; NVIDIA took a minority stake in August 2026.

Projects

Frequently asked questions

How many data centers does Cloverleaf Infrastructure have?
Data Center Index tracks 3 data center campuses with Cloverleaf Infrastructure named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Cloverleaf Infrastructure have?
2.7 GW across 3 tracked campuses, counting operating and pipeline sites together. Of the 2 Cloverleaf Infrastructure campuses with a capacity figure, 0 are filed, 0 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Cloverleaf Infrastructure build data centers?
Tracked Cloverleaf Infrastructure campuses sit in 3 markets: AL (1), GA (1), KS (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Cloverleaf Infrastructure data center?
Project Red Clay in Lowndes County, AL is the largest tracked Cloverleaf Infrastructure campus at 1.5 GW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.

Profile sources