Beale Infrastructure Project Pilot (De Soto)
AI data center in De Soto, KS, United States — under construction.
- Location: De Soto, KS, United States
- Developer: Beale Infrastructure
- Status: under construction
- Estimated cost: $3.0B
Beale Infrastructure Project Pilot (De Soto) is a AI data center project located in De Soto, KS, United States, currently under construction. It is being built by Beale Infrastructure. The estimated build cost is $3.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across KS, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Blue Owl-backed Beale detailed a $3B, four-building, ~1M sq ft hyperscale campus on 290 acres near K-10 in De Soto, with first-phase construction to begin May 2026; an unnamed large technology company will lease the campus; Evergy to serve power; IRBs up to $50B approved.
Related data center projects
- Project Blue (Beale Infrastructure) — 286 MW, Tucson, AZ, United States · under construction
- Google / Beale Project Clydesdale, Owasso, OK, United States · under construction
- Beale Project Mustang (Claremore), Claremore, OK, United States · permitted
- Beale Luckett Data Center (Marana), Marana, AZ, United States · permitted
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted