North Dakota Data Centers
Live tracking of every data center project in North Dakota (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 6
- Operating and expanding: 1
- Under construction: 2
- Announced: 6
- Operating capacity: 1.8 GW
- Pipeline capacity: 2.2 GW
Ellendale is North Dakota's data center town: Applied Digital's 400 MW Polaris Forge 1 is operating there for CoreWeave, and the company is building Polaris Forge 2 in Harwood and Polaris Forge 3 in Center, at 300 MW each. The Nakota AI Data Campus near Williston is announced at 1 GW.
Data Center Index tracks 14 named data center campuses in North Dakota (large sites with a source, not every building): 6 operating, 2 under construction, and 6 announced or permitted. The pipeline adds up to 2.2 GW of planned capacity. Below: every tracked project in North Dakota, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in North Dakota
- Applied Digital Polaris Forge 1 (Ellendale), 400 MW, Ellendale · operational · developer: Applied Digital · tenant: CoreWeave · ~$5B
- Atlas Power Data Center, 700 MW, Williston · operational · developer: Atlas Power · ~$1.9B
- Adakon Energy Solutions Coal Creek Data Center, 225 MW, Underwood · operational · developer: Adakon Energy Solutions
- Applied Digital Ellendale Hosting Facility, 180 MW, Ellendale · operational · developer: Applied Digital
- Applied Digital Jamestown Hosting Facility, 106 MW, Jamestown · operational · developer: Applied Digital
- Applied Digital Polaris Forge 1 Building 1, 100 MW, Ellendale · operational · developer: Applied Digital
- Core Scientific Grand Forks, 100 MW, Grand Forks · operational · developer: Core Scientific
- Applied Digital Polaris Forge 2 (Harwood), 300 MW, Harwood · under construction · developer: Applied Digital · tenant: Oracle · ~$3B
- Applied Digital Polaris Forge 3, 300 MW, Center · under construction · developer: Applied Digital
- Nakota AI Data Campus (Williams County), 1 GW, Williams County · announced · developer: Tachyon 9 / Nixxy · tenant: Nidar Infrastructure (Yotta Data Services)
- Geronimo Power Harmony Energy Park Data Center, 540 MW, Mapleton · announced · developer: Geronimo Power
- Teton Digital Project Trinity (Tioga), 100 MW, Tioga · announced · developer: Teton Digital
- River Run Energy Center Data Center Campus, Stanton · announced · developer: NextEra Energy Resources and Basin Electric
- Project Fighting Pike (Williston), Williston · permitted · developer: Critical Data House
- Rainbow Energy Park Data Center Campus, Underwood · permitted · developer: Rainbow Energy Center
Frequently asked questions
- How many data centers are in North Dakota?
- Data Center Index tracks 14 named data center campuses in North Dakota as of 2026: 6 operating, 2 under construction, and 6 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does North Dakota have?
- 1.8 GW is operating, with 2.2 GW in the announced and under-construction pipeline. Of the 11 North Dakota campuses with a capacity figure, 3 are filed, 5 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in North Dakota?
- Nakota AI Data Campus (Williams County) in Williams County is the largest tracked campus in North Dakota at 1 GW, developed by Tachyon 9 / Nixxy. The developer or the press states that capacity, in a source dated July 2, 2026.
- Who is building data centers in North Dakota?
- The most active developers in North Dakota by tracked campus count are Applied Digital (5 campuses), Atlas Power (1 campus), Adakon Energy Solutions (1 campus). Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to North Dakota
These public companies have tracked data-center projects in North Dakota as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- CoreWeave (CRWV), gpu cloud · 2 projects in North Dakota
Other data center markets
Tracked US markets, ranked by pipeline capacity:
- Texas data centers, 107 tracked projects, 41.4 GW pipeline
- Utah data centers, 14 tracked projects, 14.3 GW pipeline
- Virginia data centers, 94 tracked projects, 13.6 GW pipeline
- Ohio data centers, 48 tracked projects, 13.2 GW pipeline
- Georgia data centers, 47 tracked projects, 9.9 GW pipeline
- Kentucky data centers, 8 tracked projects, 8.3 GW pipeline
- Pennsylvania data centers, 26 tracked projects, 7.1 GW pipeline
- Kansas data centers, 11 tracked projects, 6.7 GW pipeline
- Illinois data centers, 15 tracked projects, 6.2 GW pipeline
- Florida data centers, 7 tracked projects, 5.6 GW pipeline
- Louisiana data centers, 8 tracked projects, 5.5 GW pipeline
- Wyoming data centers, 8 tracked projects, 5.1 GW pipeline
- Oklahoma data centers, 13 tracked projects, 4.5 GW pipeline
- Missouri data centers, 10 tracked projects, 4 GW pipeline
- Arizona data centers, 31 tracked projects, 3.9 GW pipeline
- Alabama data centers, 10 tracked projects, 3.8 GW pipeline
- Nevada data centers, 16 tracked projects, 3.4 GW pipeline
- Maryland data centers, 6 tracked projects, 3.2 GW pipeline
- West Virginia data centers, 9 tracked projects, 2.9 GW pipeline
- Arkansas data centers, 8 tracked projects, 2.7 GW pipeline
- North Carolina data centers, 16 tracked projects, 2.3 GW pipeline
- Michigan data centers, 11 tracked projects, 2.2 GW pipeline
- South Carolina data centers, 8 tracked projects, 1.5 GW pipeline
- Indiana data centers, 22 tracked projects, 1.5 GW pipeline
- Oregon data centers, 14 tracked projects, 1.4 GW pipeline
- Iowa data centers, 22 tracked projects, 1.4 GW pipeline
- New York data centers, 9 tracked projects, 1.4 GW pipeline
- California data centers, 12 tracked projects, 1.3 GW pipeline
- New Mexico data centers, 3 tracked projects, 1.3 GW pipeline
- Colorado data centers, 5 tracked projects, 1.1 GW pipeline
- Wisconsin data centers, 8 tracked projects, 1.1 GW pipeline
- Montana data centers, 2 tracked projects, 1.1 GW pipeline
- Idaho data centers, 5 tracked projects, 840 MW pipeline
- New Jersey data centers, 3 tracked projects, 550 MW pipeline
- Mississippi data centers, 10 tracked projects, 500 MW pipeline
- South Dakota data centers, 2 tracked projects, 500 MW pipeline
- Nebraska data centers, 7 tracked projects, 403 MW pipeline
- Massachusetts data centers, 1 tracked project, 274 MW pipeline
- Minnesota data centers, 6 tracked projects, 178 MW pipeline
- Connecticut data centers, 1 tracked project, 100 MW pipeline
- Tennessee data centers, 8 tracked projects, 10 MW pipeline
- Maine data centers, 1 tracked project
- Washington data centers, 5 tracked projects