Oracle (ORCL)
Enterprise software company that runs Oracle Cloud Infrastructure and builds large AI data center capacity, including Stargate sites for OpenAI. A planned Nashville world headquarters is not yet built.
- Type: Hyperscaler
- Ownership: Public company (ORCL)
- Headquarters: Austin, TX
- Founded: 1977
- Website: oracle.com
- Ticker: ORCL
- Projects tracked: 3
- Total pipeline: 852 MW
Projects
- Oracle AI Cloud Infrastructure (US), 800 MW, Ashburn, United States · operational
- DataBank Red Oak Campus, 480 MW, Red Oak, TX, United States · under construction
- Applied Digital Polaris Forge 2 (Harwood), 300 MW, Harwood, ND, United States · under construction
- Oracle AIS Cloud (Thailand) Sovereign Region, 120 MW, Bangkok, Thailand · operational
- Oracle Batam, 72 MW, Indonesia · operational
- Oracle Cloud Greece (Athens), 60 MW, Athens, Greece · operational
- Oracle Malaysia Region, Kulai, Malaysia · operational
- Oracle Cloud India South (Hyderabad) Region, India · operational
- Oracle Cloud Japan East (Tokyo), Tokyo, Japan · operational
Frequently asked questions
- How many data centers does Oracle have?
- Data Center Index tracks 3 data center campuses with Oracle named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Oracle have?
- 852 MW across 3 tracked campuses, counting operating and pipeline sites together. Of the 6 Oracle campuses with a capacity figure, 1 is filed, 2 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Oracle build data centers?
- Tracked Oracle campuses sit in 9 markets: Greece (1), India (1), Indonesia (1), Japan (1), Malaysia (1), ND (1), Thailand (1), TX (1), and 1 more. The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Oracle data center?
- Oracle AI Cloud Infrastructure (US) in Ashburn, United States is the largest tracked Oracle campus at 800 MW, currently operational. That capacity is an estimate. We modeled or inferred it, and no source states it.