DayOne Nongsa Digital Park Campus (Batam)
72 MW AI data center in Batam, Indonesia: operational.
- Capacity: 72 MW
- Location: Batam, Indonesia
- Developer: DayOne Data Centers
- Tenant: Oracle
- Status: operational
- Estimated cost: $2.7B
DayOne Nongsa Digital Park Campus (Batam) is a 72 MW AI data center project located in Batam, Indonesia, currently operational. It is being built by DayOne Data Centers for tenant Oracle. The estimated build cost is $2.7B. This project is one of thousands of data-center facilities tracked by Data Center Index across Indonesia, covering operational, under-construction, announced, and permitted sites.
Notes
Users: Tencent; Epoch 'Current power' = 72 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to DayOne Nongsa Digital Park Campus (Batam)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Oracle (ORCL), developer · hyperscaler
- Oracle (ORCL), tenant · hyperscaler
Related data center projects
- DayOne Nusajaya, Malaysia · operational
- BDx AI Campus 2 (CGK4) Jatiluhur, 640 MW, Jatiluhur, Purwakarta, Indonesia · under construction
- Digital Edge CGK AI Mega Campus, 500 MW, Bekasi Regency, Indonesia · under construction
- AWS Indonesia Cloud Region (Jakarta), 250 MW, Jakarta, Indonesia · operational
- Princeton Digital Group JC4 Campus, 240 MW, Bekasi Regency, Indonesia · under construction
- EdgeConneX Jakarta Campus (Cikarang), 200 MW, Cikarang, Indonesia · operational
- EDGNEX Jakarta AI Data Center, 144 MW, Jakarta, Indonesia · under construction
- Princeton Digital Group JC3 Campus, 120 MW, Bekasi Regency, Indonesia · under construction
Frequently asked questions
- What is DayOne Nongsa Digital Park Campus (Batam)?
- DayOne Nongsa Digital Park Campus (Batam) is an AI data center project in Batam, Indonesia tracked by Data Center Index. Its status is operational.
- Where is DayOne Nongsa Digital Park Campus (Batam)?
- DayOne Nongsa Digital Park Campus (Batam) is in Batam, Indonesia.
- How big is DayOne Nongsa Digital Park Campus (Batam)?
- Data Center Index tracks DayOne Nongsa Digital Park Campus (Batam) at 72 MW, on an estimated $2.7B build. The developer or the press states that capacity, in a source dated November 5, 2026.
- Who is building DayOne Nongsa Digital Park Campus (Batam)?
- DayOne Data Centers is developing DayOne Nongsa Digital Park Campus (Batam), with Oracle named as the tenant.
- Which public companies are linked to DayOne Nongsa Digital Park Campus (Batam)?
- Data Center Index links 2 tracked public companies to DayOne Nongsa Digital Park Campus (Batam): Oracle (ORCL), Oracle (ORCL). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Oracle (oracle.com · press · 2026-09-21)
- CloudTech (cloudcomputing-news.net) (cloudcomputing-news.net · press · 2025-07-14)
- Oracle Batam | AI Data Centers (epoch.ai · aggregator · 2026-09-11)
- DayOne Data Centers (dayonedc.com · press · 2026-11-05)
- asiaasset.com (press · 2026-09-18)