Oracle Batam
94 MW AI data center in Indonesia — under construction.
- Capacity: 94 MW
- Location: Indonesia
- Developer: Oracle
- Status: under construction
- Estimated cost: $2.8B
Oracle Batam is a 94 MW AI data center project located in Indonesia, currently under construction. It is being built by Oracle. The estimated build cost is $2.8B. This project is one of thousands of data-center facilities tracked by Data Center Index across Indonesia — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 94 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Oracle Batam
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Oracle (ORCL) — developer · hyperscaler
Related data center projects
- OpenAI Stargate New Mexico — 2.2 GW, NM, United States · under construction
- OpenAI Stargate Shackelford — 2.0 GW, Abilene, TX, United States · operational
- OpenAI Stargate Michigan — 1.4 GW, MI, United States · operational
- OpenAI Stargate Wisconsin — 1.3 GW, WI, United States · operational
- OpenAI Stargate Abilene — 1.2 GW, Abilene, TX, United States · operational
- Oracle AI Cloud Infrastructure (US) — 800 MW, Hillsboro, IL, United States · operational
- Oracle — Malaysia Public Cloud Region — 500 MW, Kuala Lumpur, Malaysia · announced
- Oracle Cloud — Greece (Athens) — 60 MW, Athens, Greece · operational