Geronimo Power

Tracked AI data center portfolio for Geronimo Power: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Geronimo Power have?
Data Center Index tracks 1 data center campus with Geronimo Power named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Geronimo Power have?
540 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Geronimo Power campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Geronimo Power build data centers?
Tracked Geronimo Power campuses sit in 1 market: ND (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Geronimo Power data center?
Geronimo Power Harmony Energy Park Data Center in Mapleton, ND is the largest tracked Geronimo Power campus at 540 MW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.