Live tracking of every data center project in South Carolina (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.

South Carolina's buildout is moving from plans to construction. QTS is building near Rock Hill, Google has sites going up in Ridgeville and St. George on top of its operating Berkeley County campus, and Meta's Aiken County campus and a NorthMark and Valara project in Spartanburg are under way too. Amentum's proposed 1 GW AI data center at the Savannah River Site and Cielo's 300 MW Gaffney campus are announced.

Data Center Index tracks 8 named data center campuses in South Carolina (large sites with a source, not every building): 1 operating, 5 under construction, and 2 announced or permitted. The pipeline adds up to 1.5 GW of planned capacity. The grid is operated by Duke Energy / Santee Cooper, which runs the interconnection queue. Below: every tracked project in South Carolina, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.

Tracked data center projects in South Carolina

Frequently asked questions

How many data centers are in South Carolina?
Data Center Index tracks 8 named data center campuses in South Carolina as of 2026: 1 operating, 5 under construction, and 2 announced or permitted. Coverage is named campuses with a published source, not every building.
How much data center capacity does South Carolina have?
380 MW is operating, with 1.5 GW in the announced and under-construction pipeline. Of the 4 South Carolina campuses with a capacity figure, 0 are filed, 2 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
What is the largest data center in South Carolina?
Savannah River Site AI Data Center & Energy Generation Project in Aiken is the largest tracked campus in South Carolina at 1 GW, developed by Amentum. The developer or the press states that capacity, in a source dated July 27, 2026.
Who is building data centers in South Carolina?
The most active developers in South Carolina by tracked campus count are Google (3 campuses), QTS Data Centers (1 campus), NorthMark Strategies (1 campus). Every campus page lists its developer, tenant and the source that names them.
Which grid operator serves South Carolina data centers?
Duke Energy / Santee Cooper runs the grid and the interconnection queue for South Carolina, so new campus power requests are approved on its timeline.

Public companies exposed to South Carolina

These public companies have tracked data-center projects in South Carolina as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.

Other data center markets