Cielo Digital Infrastructure

US developer of data center sites with access to grid power; sold its Culpeper, VA project to EdgeCore. Backed by Arroyo Energy Investors from 2023; Arroyo lists the investment as realized in March 2026, buyer undisclosed.

Projects

Frequently asked questions

How many data centers does Cielo Digital Infrastructure have?
Data Center Index tracks 2 data center campuses with Cielo Digital Infrastructure named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Cielo Digital Infrastructure have?
1.1 GW across 2 tracked campuses, counting operating and pipeline sites together. Of the 2 Cielo Digital Infrastructure campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Cielo Digital Infrastructure build data centers?
Tracked Cielo Digital Infrastructure campuses sit in 2 markets: CO (1), SC (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Cielo Digital Infrastructure data center?
Cielo Hudson Data Center Campus in CO is the largest tracked Cielo Digital Infrastructure campus at 750 MW, currently announced. The developer or the press states that capacity, in a source dated October 7, 2026.

Profile sources