Atlas Power

Tracked AI data center portfolio for Atlas Power: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Atlas Power have?
Data Center Index tracks 1 data center campus with Atlas Power named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Atlas Power have?
700 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Atlas Power campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Atlas Power build data centers?
Tracked Atlas Power campuses sit in 1 market: ND (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Atlas Power data center?
Atlas Power Data Center in Williston, ND is the largest tracked Atlas Power campus at 700 MW, currently operational. The developer or the press states that capacity, in a source dated January 26, 2022.