DAMAC Digital
Data center arm of Dubai's DAMAC Group, building AI-ready facilities in the Middle East, Southeast Asia, Europe and the US. Formerly EDGNEX Data Centers by DAMAC; renamed in June 2025.
- Type: Hyperscale campus developer
- Ownership: Owned by DAMAC Group
- Headquarters: Dubai, United Arab Emirates
- Founded: 2021
- Website: damacdigital.com
- Projects tracked: 2
- Total pipeline: 250 MW
Projects
- DAMAC Laguna AI Data Center, 250 MW, Biñan, Philippines · announced
- DAMAC Digital Edgerton (Logistics Park Kansas City), Edgerton, KS, United States · permitted
Frequently asked questions
- How many data centers does DAMAC Digital have?
- Data Center Index tracks 2 data center campuses with DAMAC Digital named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does DAMAC Digital have?
- 250 MW across 2 tracked campuses, counting operating and pipeline sites together. Of the 1 DAMAC Digital campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does DAMAC Digital build data centers?
- Tracked DAMAC Digital campuses sit in 2 markets: KS (1), Philippines (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest DAMAC Digital data center?
- DAMAC Laguna AI Data Center in Biñan, Philippines is the largest tracked DAMAC Digital campus at 250 MW, currently announced. The developer or the press states that capacity, in a source dated January 15, 2026.