AWS / STACK Bossier Parish Campus (Benton)
AI data center in Benton, LA, United States — under construction.
- Location: Benton, LA, United States
- Developer: STACK Infrastructure
- Tenant: Amazon Web Services
- Status: under construction
- Estimated cost: $6.0B
AWS / STACK Bossier Parish Campus (Benton) is a AI data center project located in Benton, LA, United States, currently under construction. It is being built by STACK Infrastructure for tenant Amazon Web Services. The estimated build cost is $6.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across LA, United States — covering operational, under-construction, announced, and permitted sites.
Project description
AWS data center north of Benton; STACK Infrastructure is developing the $6 billion project for Amazon; six buildings of about 218,000 sq ft each; campus expected to begin operations in 2028; water agreement with project entity TXLAAR worth ~$12M/yr to Bossier City.
Related data center projects
- STACK PHX02 Central Phoenix — 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale — 225 MW, Avondale, AZ, United States · operational
- STACK DFW02 Lancaster — 220 MW, Lancaster, TX, United States · announced
- STACK POR03 Hillsboro Campus — 200 MW, Hillsboro, OR, United States · operational
- STACK SVY02 Santa Clara Campus — 48 MW, Santa Clara, CA, United States · operational
- AWS / STACK Caddo Parish Campus (Stateline Road, Blanchard), Blanchard, LA, United States · under construction
- AWS / STACK Shreveport Campus (Resilient Technology Park), Shreveport, LA, United States · announced
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction