Hut 8 (HUT)
Bitcoin miner and energy infrastructure operator developing AI data center campuses. The current Hut 8 Corp was formed by the November 2023 merger of Hut 8 Mining and U.S. Bitcoin Corp; listed on Nasdaq and TSX.
- Type: Bitcoin miner moving into AI hosting
- Ownership: Public company (HUT)
- Headquarters: Miami, FL
- Website: hut8.com
- Ticker: HUT
- Projects tracked: 4
- Total pipeline: 1.7 GW
Projects
- Beacon Point, 704 MW, Nueces County, TX, United States · under construction
- Hut 8 Logan Prairie Data Center, 500 MW, Logan County, IL, United States · announced
- Hut 8 River Bend AI Campus, 245 MW, West Feliciana Parish, LA, United States · under construction
- Hut 8 Vega, 205 MW, Vega, TX, United States · operational
Frequently asked questions
- How many data centers does Hut 8 have?
- Data Center Index tracks 4 data center campuses with Hut 8 named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Hut 8 have?
- 1.7 GW across 4 tracked campuses, counting operating and pipeline sites together. Of the 4 Hut 8 campuses with a capacity figure, 0 are filed, 4 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Hut 8 build data centers?
- Tracked Hut 8 campuses sit in 3 markets: TX (2), IL (1), LA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Hut 8 data center?
- Beacon Point in Nueces County, TX is the largest tracked Hut 8 campus at 704 MW, currently under construction. The developer or the press states that capacity, in a source dated July 20, 2026.