Hut 8 (HUT)

Bitcoin miner and energy infrastructure operator developing AI data center campuses. The current Hut 8 Corp was formed by the November 2023 merger of Hut 8 Mining and U.S. Bitcoin Corp; listed on Nasdaq and TSX.

Projects

Frequently asked questions

How many data centers does Hut 8 have?
Data Center Index tracks 4 data center campuses with Hut 8 named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Hut 8 have?
1.7 GW across 4 tracked campuses, counting operating and pipeline sites together. Of the 4 Hut 8 campuses with a capacity figure, 0 are filed, 4 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Hut 8 build data centers?
Tracked Hut 8 campuses sit in 3 markets: TX (2), IL (1), LA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Hut 8 data center?
Beacon Point in Nueces County, TX is the largest tracked Hut 8 campus at 704 MW, currently under construction. The developer or the press states that capacity, in a source dated July 20, 2026.