Meta — Clonee AI Data Center Campus
288 MW AI data center in Clonee, Ireland — operational.
- Capacity: 288 MW
- Location: Clonee, Ireland
- Developer: Meta
- Status: operational
- Energy source: Renewable (100% matched)
Meta — Clonee AI Data Center Campus is a 288 MW AI data center project located in Clonee, Ireland, currently operational. It is being built by Meta. Power for the facility is sourced from Renewable (100% matched). This project is one of thousands of data-center facilities tracked by Data Center Index across Ireland — covering operational, under-construction, announced, and permitted sites.
Project description
Meta's Clonee campus in Ireland has run since 2012 and is tracked at 288 MW, fully matched with renewables. It trains Llama models and serves Facebook and Instagram inference for Europe.
Public companies linked to Meta — Clonee AI Data Center Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META) — developer · hyperscaler
Related data center projects
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational
- Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States · announced
- Meta Prometheus — 1.1 GW, New Albany, OH, United States · operational
- Project Domino — 1.0 GW, Lebanon, IN, United States · announced
- El Paso DC — 1.0 GW, El Paso, TX, United States · operational
- Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States · under construction
- Meta-TerraPower Natrium Power Agreement — 690 MW, United States · announced