Meta — Clonee AI Data Center Campus
288 MW AI data center in Clonee, Ireland — operational.
- Capacity: 288 MW
- Location: Clonee, Ireland
- Developer: Meta
- Status: operational
- Energy source: Renewable (100% matched)
Meta — Clonee AI Data Center Campus is a 288 MW AI data center project located in Clonee, Ireland, currently operational. It is being built by Meta. Power for the facility is sourced from Renewable (100% matched). This project is one of thousands of data-center facilities tracked by Data Center Index across Ireland — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Meta — Clonee AI Data Center Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META) — developer · hyperscaler
Related data center projects
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational
- Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States · announced
- Meta Prometheus — 1.1 GW, New Albany, OH, United States · operational
- Project Domino — 1.0 GW, Lebanon, IN, United States · announced
- El Paso DC — 1.0 GW, El Paso, TX, United States · operational
- Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States · under construction
- Meta — Luleå, Sweden AI Data Center Campus — 300 MW, Luleå, Sweden · operational