Meta-QTS Hillsboro 2
180 MW AI data center in Hillsboro, OR, United States: operational.
- Capacity: 180 MW
- Location: Hillsboro, OR, United States
- Developer: QTS Data Centers
- Tenant: Meta
- Status: operational
- Estimated cost: $6.8B
- Energy source: Renewable
Meta-QTS Hillsboro 2 is a 180 MW AI data center project located in Hillsboro, OR, United States, currently operational. It is being built by QTS Data Centers for tenant Meta. The estimated build cost is $6.8B. Its energy source is listed as Renewable. This project is one of thousands of data-center facilities tracked by Data Center Index across OR, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 180 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Meta-QTS Hillsboro 2
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
- Meta Platforms (META), tenant · hyperscaler
Related data center projects
- Project Marvel (QTS Bessemer), 1.2 GW, Bessemer, AL, United States · permitted
- QTS Richmond, 921 MW, Sandston, VA, United States · operational
- QTS Phoenix 3 (Glendale C|303), 750 MW, Glendale, AZ, United States · announced
- Microsoft Fairwater Atlanta, 636 MW, Fayetteville, GA, United States · operational
- QTS Van Wert Campus, 500 MW, Van Wert, OH, United States · permitted
- QTS Eagle Mountain, 304 MW, Eagle Mountain, UT, United States · under construction
- QTS Richmond 3, 240 MW, Sandston, VA, United States · operational
- QTS Richmond 1, 238 MW, Sandston, VA, United States · operational
Frequently asked questions
- What is Meta-QTS Hillsboro 2?
- Meta-QTS Hillsboro 2 is an AI data center project in Hillsboro, Oregon tracked by Data Center Index. Its status is operational.
- Where is Meta-QTS Hillsboro 2?
- Meta-QTS Hillsboro 2 is in Hillsboro, Oregon. Every tracked Oregon campus, with counts and capacity, is at https://datacenterindex.ai/markets/oregon.
- How big is Meta-QTS Hillsboro 2?
- Data Center Index tracks Meta-QTS Hillsboro 2 at 180 MW, on an estimated $6.8B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Meta-QTS Hillsboro 2?
- QTS Data Centers is developing Meta-QTS Hillsboro 2, with Meta named as the tenant.
- Which public companies are linked to Meta-QTS Hillsboro 2?
- Data Center Index links 2 tracked public companies to Meta-QTS Hillsboro 2: Meta Platforms (META), Meta Platforms (META). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Data Center Frontier (datacenterfrontier.com · press · 2022-05-17)
- Hillsboro 2 Data Center (q.com · press · 2026-09-20)
- Meta-QTS Hillsboro 2 | AI Data Centers (epoch.ai · aggregator · 2026-09-11)