Meta Temple
238 MW AI data center in Temple, TX, United States — operational.
- Capacity: 238 MW
- Location: Temple, TX, United States
- Developer: Meta
- Status: operational
- Estimated cost: $5.8B
- Energy source: Mixed (renewable targets)
Meta Temple is a 238 MW AI data center project located in Temple, TX, United States, currently operational. It is being built by Meta. The estimated build cost is $5.8B. Power for the facility is sourced from Mixed (renewable targets). This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 198 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Meta Temple
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META) — developer · hyperscaler
- Meta Platforms (META) — tenant · hyperscaler
Related data center projects
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational
- Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States · announced
- Meta Prometheus — 1.1 GW, New Albany, OH, United States · operational
- Project Domino — 1.0 GW, Lebanon, IN, United States · announced
- El Paso DC — 1.0 GW, El Paso, TX, United States · operational
- Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States · under construction
- Meta — Luleå, Sweden AI Data Center Campus — 300 MW, Luleå, Sweden · operational