Meta Temple
152 MW AI data center in Temple, TX, United States: operational.
- Capacity: 152 MW
- Location: Temple, TX, United States
- Developer: Meta
- Status: operational
- Estimated cost: $1.2B
- Energy source: Mixed (renewable targets)
Meta Temple is a 152 MW AI data center project located in Temple, TX, United States, currently operational. It is being built by Meta. The estimated build cost is $1.2B. The site draws on a mix of power sources (renewable targets). This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 178 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Meta Temple
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
- Meta Platforms (META), tenant · hyperscaler
Related data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.1 GW, Perry, OH, United States · announced
- Meta Lebanon Data Center (Project Domino), 1 GW, Lebanon, IN, United States · under construction
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Meta DeKalb Data Center, 800 MW, DeKalb, IL, United States · operational
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Altoona, Iowa AI Data Center Campus, 350 MW, Altoona, IA, United States · operational
Frequently asked questions
- What is Meta Temple?
- Meta Temple is an AI data center project in Temple, Texas tracked by Data Center Index. Its status is operational.
- Where is Meta Temple?
- Meta Temple is in Temple, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- How big is Meta Temple?
- Data Center Index tracks Meta Temple at 152 MW, on an estimated $1.2B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Meta Temple?
- Meta is developing Meta Temple.
- Which public companies are linked to Meta Temple?
- Data Center Index links 2 tracked public companies to Meta Temple: Meta Platforms (META), Meta Platforms (META). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- AI Data Center Index facility profile: Meta Fort Worth Texas Ai Campus (epoch · aggregator · 2026-04-29)
- Meta Data Centers (company blog) (datacenters.atmeta.com · press · 2026-07-22)
- KWTX (CBS Central Texas) (kwtx.com · press · 2026-07-22)
- JE Dunn Construction (general contractor project page) (jedunn.com · press · 2026-07-22)
- Spectrum News 1 (spectrumlocalnews.com · press · 2026-07-22)
- City of Temple (templetx.gov · press · 2026-07-22)