Meta Temple
238 MW AI data center in Temple, TX, United States — operational.
- Capacity: 238 MW
- Location: Temple, TX, United States
- Developer: Meta
- Status: operational
- Estimated cost: $5.8B
- Energy source: Mixed (renewable targets)
Meta Temple is a 238 MW AI data center project located in Temple, TX, United States, currently operational. It is being built by Meta. The estimated build cost is $5.8B. Power for the facility is sourced from Mixed (renewable targets). This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 198 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Linked public companies
- Meta Platforms (META) — developer
- Meta Platforms (META) — tenant