Austin, Waco and Central Texas Data Centers
This page covers Austin, Waco and Temple: 23 counties from Travis and Williamson out to Bastrop and Caldwell, north through Bell and Milam, and up to McLennan and Hill. All of it is on the ERCOT grid, served by Austin Energy, Oncor and a mix of electric cooperatives. 26 data center campuses are open, being built or planned here: 9 operating (2 still adding buildings), 7 under construction and 10 announced or permitted. The largest is Nexus Hubbard Campus in Hill County, at 7.7 GW (an estimate), developed by Nexus Data Centers. Williamson County has the most campuses, with 7.
- Campuses: 26
- Operating: 9 (2 expanding)
- Under construction: 7
- Announced or permitted: 10
- Capacity at full build: 14.8 GW (includes 3 est. figures)
Data center campuses in Central Texas
- Riot Rockdale AI Campus, Milam County (Milam County) · operational · 241 MW · developer: Riot Platforms
- Sabey Round Rock, Round Rock (Williamson County) · operational · 84 MW · developer: Sabey Data Centers
- CyrusOne AUS2 Campus, Austin (Travis County) · operational · 19 MW · developer: CyrusOne
- Core Scientific Austin 1 (CoreWeave), Austin (Travis County) · operational · 16 MW · developer: Core Scientific
- Bitdeer Rockdale, Milam County (Milam County) · operational · developer: Bitdeer Technologies Group
- Digital Realty AUS11 Austin, Austin (Travis County) · operational · developer: Digital Realty
- Element Critical Austin One Austin, Austin (Travis County) · operational · developer: Element Critical
- Lightedge Austin Burleson Road, Austin (Travis County) · operational · developer: Lightedge
- Meta Temple, Temple (Bell County) · operational · developer: Meta
- Nexus Hubbard Campus, Hill County (Hill County) · under construction · 7.7 GW est. · developer: Nexus Data Centers
- OpenAI Stargate Milam, Milam County (Milam County) · under construction · 1.2 GW · developer: SB Energy
- Skybox PowerCampus Austin (Hutto), Hutto (Williamson County) · under construction · 400 MW est. · developer: Skybox Datacenters / Prologis
- Rowan Project Temple, Temple (Bell County) · under construction · 300 MW · developer: Rowan Digital Infrastructure
- CyrusOne DFW10, Bosque County (Bosque County) · under construction · developer: CyrusOne
- CyrusOne Fairfield Campus (DFW20), Freestone County (Freestone County) · under construction · developer: CyrusOne
- EdgeConneX Cedar Creek Campus, Bastrop County (Bastrop County) · under construction · developer: EdgeConneX
- Tract Caldwell Valley Technology Park, Caldwell County (Caldwell County) · announced · 4 GW · developer: Tract
- Pacifico Cedar Creek Data Center and Power Campus, Bastrop County (Bastrop County) · announced · 490 MW · developer: BlackChamber / Pacifico Energy
- Galaxy McGregor Campus, McGregor (McLennan County) · announced · developer: Galaxy Digital
- Iron Mountain Taylor, Taylor (Williamson County) · announced · developer: Iron Mountain
- Switch Austin AUS4 (Dell Way, Round Rock), Round Rock (Williamson County) · permitted · 285 MW est. · developer: Switch
- Colovore Hutto, Hutto (Williamson County) · permitted · 40 MW · developer: Colovore
- Edged Austin (Maxwell), Maxwell (Caldwell County) · permitted · developer: Edged
- KDC Project Comal Taylor, Taylor (Williamson County) · permitted · developer: KDC Real Estate Development and Investments
- Switch Transwestern Data Ranch Campus, Austin (Travis County) · permitted · developer: Switch
- Taylor Technology Campus, Taylor (Williamson County) · permitted · developer: Big Watt Digital / PowerHouse Data Centers
Questions about Central Texas data centers
- How many data centers are in Central Texas?
- 26 named data center campuses are in Central Texas as of 2026: 9 operating (2 still adding buildings), 7 under construction and 10 announced or permitted. The count covers named campuses with a published source, not every building, and leaves out paused or cancelled projects.
- What is the largest data center in Central Texas?
- Nexus Hubbard Campus in Hill County is the largest at 7.7 GW (an estimate), developed by Nexus Data Centers. It is under construction.
- Which data centers are under construction in Central Texas?
- 7 campuses are under construction: Nexus Hubbard Campus (Hill County), OpenAI Stargate Milam (Milam County), Skybox PowerCampus Austin (Hutto) (Hutto), Rowan Project Temple (Temple), CyrusOne DFW10 (Bosque County) and CyrusOne Fairfield Campus (DFW20) (Freestone County), and 1 more listed on this page.
- How much data center capacity is planned in Central Texas?
- The 12 campuses with a published capacity add up to 14.8 GW at full build. 3 of those figures are estimates, marked "est." in the list. The other 14 have no published figure yet.
- Which counties are in Central Texas?
- This page follows the Capital Area, Heart of Texas and Central Texas council of governments planning regions: Bastrop, Blanco, Burnet, Caldwell, Fayette, Hays, Lee, Llano, Travis, Williamson, Bosque, Falls, Freestone, Hill, Limestone, McLennan, Bell, Coryell, Hamilton, Lampasas, Milam, Mills and San Saba counties. Campuses sit in Williamson County (7), Travis County (6), Milam County (3), Bastrop County (2), Bell County (2), Caldwell County (2), Bosque County (1), Freestone County (1), Hill County (1) and McLennan County (1).
Other Texas regions
- North Texas data centers, 53 campuses
- West Texas data centers, 13 campuses
- Abilene and the Big Country data centers, 7 campuses
- Texas Panhandle and South Plains data centers, 12 campuses
- San Antonio and South Texas data centers, 22 campuses