CyrusOne Fairfield Campus (DFW20)
AI data center in Freestone County, TX, United States: under construction.
Updated
- Location: Freestone County, TX, United States
- Developer: CyrusOne
- Status: under construction
- Estimated cost: $1.8B
CyrusOne Fairfield Campus (DFW20) is an AI data center project located in Freestone County, TX, United States, currently under construction. It is being built by CyrusOne. The estimated build cost is $1.8B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Texas.
Project description
CyrusOne LLC took a Texas air authorization on 21 July 2026 for three buildings, DFW20A, DFW20B and DFW20C, on FM 488 about 2.5 miles south of FM 416 in Freestone County. CyrusOne's own site page lists the campus as in development next to Calpine's Freestone Energy Center at 1366 FM 488 in Fairfield, with over $500 million of investment across multiple phases. Local reporting in June 2026 described land being bought for a second phase.
Related data center projects
- CyrusOne Palmetto (Project Peach), 700 MW, Coweta County, GA, United States · cancelled
- CyrusOne Sangamon County Campus (Talkington Township), 634 MW, Sangamon County, IL, United States · permitted
- CyrusOne Yorkville Technology Campus, 480 MW, Yorkville, IL, United States · under construction
- CyrusOne DFW7, 200 MW, Fort Worth, TX, United States · under construction
- CyrusOne Mesa, 198 MW, Mesa, AZ, United States · permitted
- CyrusOne Chandler (PHX1-PHX8), 169 MW, Chandler, AZ, United States · operational
- NAS Lemoore AI Data Center (Ameresco / CyrusOne), 100 MW, Lemoore, CA, United States · announced
- CyrusOne Frankfurt FRA6 (Europark, Sossenheim), 84 MW, Frankfurt, Germany · announced
Frequently asked questions
- What is CyrusOne Fairfield Campus (DFW20)?
- CyrusOne Fairfield Campus (DFW20) is an AI data center project in Freestone County, Texas tracked by Data Center Index. Its status is under construction.
- Where is CyrusOne Fairfield Campus (DFW20)?
- CyrusOne Fairfield Campus (DFW20) is in Freestone County, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- Who is building CyrusOne Fairfield Campus (DFW20)?
- CyrusOne is developing CyrusOne Fairfield Campus (DFW20).
- When will CyrusOne Fairfield Campus (DFW20) come online?
- The next building at CyrusOne Fairfield Campus (DFW20) is expected online March 23, 2027. That date is the first building going live, not the full build-out.
Sources
- TCEQ Permit Search: RN112493135 DFW20A DFW20B DFW20C (permit-search.tceq.texas.gov · public record · 2026-07-21)
- DCD (datacenterdynamics.com · press · 2026-07-31)
- Texas Department of Licensing and Regulation (tdlr.texas.gov · public record · 2026-10-17)
- TDLR TABS project TABS2026026907, DFW20C FIT-OUT (tdlr.texas.gov · public record · 2026-08-04)
- CyrusOne and Constellation (cyrusone.com · press · 2026-02-09)
- CyrusOne (cyrusone.com · press · 2026-10-31)
- DCD (datacenterdynamics.com · press · 2026-07-31)
- Texas Department of Licensing and Regulation (tdlr.texas.gov · public record · 2026-07-31)
- Texas Department of Licensing and Regulation (tdlr.texas.gov · public record · 2026-08-04)