CyrusOne Mesa
198 MW AI data center in Mesa, AZ, United States: permitted.
- Capacity: 198 MW
- Location: Mesa, AZ, United States
- Developer: CyrusOne
- Status: permitted
CyrusOne Mesa is a 198 MW AI data center project located in Mesa, AZ, United States, currently permitted. It is being built by CyrusOne. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States, covering operational, under-construction, announced, and permitted sites.
Project description
On July 24, 2024, Mesa's Planning and Zoning Commission voted 4-3 in favor of a general plan amendment and rezoning for CyrusOne's campus near Elliot and Ellsworth roads. The plan is five two-story buildings of 290,023 sq ft each, 1.4M+ sq ft in total.
Related data center projects
- CyrusOne Fairfield Campus (DFW20), 760 MW, Fairfield, TX, United States · under construction
- CyrusOne Palmetto (Project Peach), 700 MW, Palmetto, GA, United States · cancelled
- CyrusOne Sangamon County Campus (Talkington Township), 600 MW, Waverly, IL, United States · permitted
- CyrusOne Yorkville Technology Campus, 480 MW, Yorkville, IL, United States · under construction
- CyrusOne DFW10, 400 MW, Whitney, TX, United States · under construction
- CyrusOne DFW7, 200 MW, Fort Worth, TX, United States · under construction
- CyrusOne Chandler (PHX1-PHX8), 169 MW, Chandler, AZ, United States · operational
- NAS Lemoore AI Data Center (Ameresco / CyrusOne), 100 MW, Lemoore, CA, United States · announced
Frequently asked questions
- What is CyrusOne Mesa?
- CyrusOne Mesa is an AI data center project in Mesa, Arizona tracked by Data Center Index. Its status is permitted.
- Where is CyrusOne Mesa?
- CyrusOne Mesa is in Mesa, Arizona. Every tracked Arizona campus, with counts and capacity, is at https://datacenterindex.ai/markets/arizona.
- How big is CyrusOne Mesa?
- Data Center Index tracks CyrusOne Mesa at 198 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building CyrusOne Mesa?
- CyrusOne is developing CyrusOne Mesa.
- When will CyrusOne Mesa come online?
- The next building at CyrusOne Mesa is expected online 2029. That date is the first building going live, not the full build-out.
Sources
- Data center campuses move forward in Mesa (abc15.com · press · 2024-07-26)
- AZBEX (azbex.com · press · 2024-07-30)
- Area Development (areadevelopment.com · press · 2018-06-08)
- Mesa Tribune (themesatribune.com · press · 2024-07-30)