CyrusOne Palmetto (Project Peach)
700 MW AI data center in Palmetto, GA, United States: permitted.
- Capacity: 700 MW
- Location: Palmetto, GA, United States
- Developer: CyrusOne
- Status: permitted
CyrusOne Palmetto (Project Peach) is a 700 MW AI data center project located in Palmetto, GA, United States, currently permitted. It is being built by CyrusOne. This project is one of thousands of data-center facilities tracked by Data Center Index across GA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Coweta County commissioners approved rezoning for Project Peach, a 2.1 million sq ft data center campus on more than 320 acres near Palmetto at State Route 14 and Johnston Circle. The campus is to be built in phases through 2036 and will use approximately 700 megawatts.
Related data center projects
- CyrusOne Sulphur Springs Data Center, 3 GW, Sulphur Springs, TX, United States · announced
- CyrusOne Sangamon County Campus (Talkington Township), 600 MW, Waverly, IL, United States · permitted
- CyrusOne Yorkville Technology Campus, 480 MW, Yorkville, IL, United States · under construction
- CyrusOne DFW7, 200 MW, Fort Worth, TX, United States · under construction
- CyrusOne Mesa, 198 MW, Mesa, AZ, United States · permitted
- CyrusOne DFW10, 190 MW, Bosque County, TX, United States · under construction
- CyrusOne Chandler (PHX1-PHX8), 169 MW, Chandler, AZ, United States · operational
- NAS Lemoore AI Data Center (Ameresco / CyrusOne), 100 MW, Lemoore, CA, United States · announced
Frequently asked questions
- What is CyrusOne Palmetto (Project Peach)?
- CyrusOne Palmetto (Project Peach) is an AI data center project in Palmetto, Georgia tracked by Data Center Index. Its status is permitted.
- Where is CyrusOne Palmetto (Project Peach)?
- CyrusOne Palmetto (Project Peach) is in Palmetto, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is CyrusOne Palmetto (Project Peach)?
- Data Center Index tracks CyrusOne Palmetto (Project Peach) at 700 MW. The developer or the press states that capacity, in a source dated April 16, 2025.
- Who is building CyrusOne Palmetto (Project Peach)?
- CyrusOne is developing CyrusOne Palmetto (Project Peach).
Sources
- Commissioners approve rezoning for Project Peach data center (times-herald.com · press · 2025-04-16)
- DeSmog (desmog.com · press · 2025-04-16)