Rowan Project Temple
300 MW AI data center in Temple, TX, United States — under construction.
- Capacity: 300 MW
- Location: Temple, TX, United States
- Developer: Rowan Digital Infrastructure
- Status: under construction
- Estimated cost: $0.7B
Rowan Project Temple is a 300 MW AI data center project located in Temple, TX, United States, currently under construction. It is being built by Rowan Digital Infrastructure. The estimated build cost is $0.7B. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Construction underway on a 300 MW, ~700-acre hyperscale campus for an unnamed top global technology company; minimum $700M investment, Oncor power, operations expected 2027.
Related data center projects
- Rowan Bauxite I, II & III (Quantum Frederick) — 630 MW, Adamstown, MD, United States · under construction
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction