Crusoe Energy — AI Cloud Data Centers (US)
100 MW AI data center in Denver, CO, United States — operational.
- Capacity: 100 MW
- Location: Denver, CO, United States
- Developer: Crusoe Energy Systems
- Status: operational
- Energy source: Mixed (stranded gas conversion)
Crusoe Energy — AI Cloud Data Centers (US) is a 100 MW AI data center project located in Denver, CO, United States, currently operational. It is being built by Crusoe Energy Systems. The site draws on a mix of power sources (stranded gas conversion). This project is one of thousands of data-center facilities tracked by Data Center Index across CO, United States — covering operational, under-construction, announced, and permitted sites.
Related data center projects
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 2.7 GW, Mount Pleasant, WI, United States · operational
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- OpenAI Stargate New Mexico — 2.5 GW, NM, United States · under construction
- AWS Project Rainier (New Carlisle, Indiana) — 2.4 GW, New Carlisle, IN, United States · operational
- Anthropic-Amazon New Carlisle — 2.3 GW, New Carlisle, IN, United States · operational
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational