Iron Mountain (IRM)

Records and information management REIT whose data center business leases colocation and wholesale capacity in North America, Europe and Asia.

Projects

Frequently asked questions

How many data centers does Iron Mountain have?
Data Center Index tracks 4 data center campuses with Iron Mountain named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Iron Mountain have?
489 MW across 4 tracked campuses, counting operating and pipeline sites together. Of the 2 Iron Mountain campuses with a capacity figure, 0 are filed, 0 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Iron Mountain build data centers?
Tracked Iron Mountain campuses sit in 3 markets: VA (2), AZ (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Iron Mountain data center?
Iron Mountain Manassas Campus (VA-1 to VA-7) in VA is the largest tracked Iron Mountain campus at 400 MW, currently operational. That capacity is an estimate. We modeled or inferred it, and no source states it.

Profile sources