Meta Mesa
AI data center in Mesa, AZ, United States — under construction.
- Location: Mesa, AZ, United States
- Developer: Meta
- Status: under construction
- Estimated cost: $1.0B
Meta Mesa is a AI data center project located in Mesa, AZ, United States, currently under construction. It is being built by Meta. The estimated build cost is $1.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Meta opened its Mesa data center Jan 30, 2025 with the first two of five planned buildings in service; the $1B+ campus will reach 2.5M sq ft and is about 40% complete, with SRP adding 450 MW of renewables to serve it.
Related data center projects
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States · announced
- Meta Prometheus — 1.1 GW, New Albany, OH, United States · operational
- Project Domino — 1.0 GW, Lebanon, IN, United States · under construction
- El Paso DC — 1.0 GW, El Paso, TX, United States · under construction
- Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States · under construction
- Meta-TerraPower Natrium Power Agreement — 690 MW, United States · announced
- Meta Montgomery — 465 MW, Co Rd 42, AL, United States · operational