Apple — Prineville, Oregon Data Center
120 MW AI data center in Prineville, OR, United States — operational.
- Capacity: 120 MW
- Location: Prineville, OR, United States
- Developer: Apple
- Status: operational
- Energy source: Renewable
Apple — Prineville, Oregon Data Center is a 120 MW AI data center project located in Prineville, OR, United States, currently operational. It is being built by Apple. Its energy source is listed as Renewable. This project is one of thousands of data-center facilities tracked by Data Center Index across OR, United States — covering operational, under-construction, announced, and permitted sites.
Related data center projects
- Apple Private Cloud Compute — AI Inference Infrastructure — 200 MW, Maiden, NC, United States · operational
- Apple Mesa, Mesa, AZ, United States · operational
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced