QTS Hillsboro 1
AI data center in Hillsboro, OR, United States: operational.
- Location: Hillsboro, OR, United States
- Developer: QTS Data Centers
- Status: operational
QTS Hillsboro 1 is a AI data center project located in Hillsboro, OR, United States, currently operational. It is being built by QTS Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across OR, United States, covering operational, under-construction, announced, and permitted sites.
Project description
QTS lists Hillsboro 1 at 4951 NE Huffman St, Hillsboro, as an existing 25-acre campus with 20 MW+ of critical power capacity, one of its three Hillsboro campuses. '20 MW+' is a floor, so no MW is filed.
Related data center projects
- Project Marvel (QTS Bessemer), 1.2 GW, Bessemer, AL, United States · permitted
- QTS Richmond, 921 MW, Sandston, VA, United States · operational
- QTS Phoenix 3 (Glendale C|303), 750 MW, Glendale, AZ, United States · announced
- Microsoft Fairwater Atlanta, 636 MW, Fayetteville, GA, United States · operational
- QTS Van Wert Campus, 500 MW, Van Wert, OH, United States · permitted
- QTS Eagle Mountain, 304 MW, Eagle Mountain, UT, United States · under construction
- QTS Richmond 3, 240 MW, Sandston, VA, United States · operational
- QTS Richmond 1, 238 MW, Sandston, VA, United States · operational