108 MW AI data center in Hillsboro, OR, United States: under construction.
- Capacity: 108 MW
- Location: Hillsboro, OR, United States
- Developer: Aligned Data Centers
- Status: under construction
Aligned Hillsboro Campus (PDX-01) is a 108 MW AI data center project located in Hillsboro, OR, United States, currently under construction. It is being built by Aligned Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across OR, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Aligned announced a 27-acre, 108 MW Hillsboro campus master-planned for two buildings. The first is at 72 MW of critical capacity and the second is planned at 36 MW.
Related data center projects
- Aligned Project Phoenix (Shippingport), 2 GW, Shippingport, PA, United States · under construction
- Project Caprock, 540 MW, Abernathy, TX, United States · under construction
- Aligned IAD-04 Frederick Campus (Quantum Frederick), 264 MW, Frederick, MD, United States · under construction
- Aligned Pataskala Data Center, 200 MW, Pataskala, OH, United States · paused
- Aligned Ashburn Campus (IAD-01), 180 MW, Ashburn, VA, United States · operational
- Aligned Chicago Campus (ORD-01 / ORD-02, Northlake), 100 MW, Northlake, IL, United States · operational
- Aligned Plano Campus (DFW04), 72 MW, Plano, TX, United States · under construction
- Aligned Glendale (PHX-13 campus), Glendale, AZ, United States · under construction
Frequently asked questions
- What is Aligned Hillsboro Campus (PDX-01)?
- Aligned Hillsboro Campus (PDX-01) is an AI data center project in Hillsboro, Oregon tracked by Data Center Index. Its status is under construction.
- Where is Aligned Hillsboro Campus (PDX-01)?
- Aligned Hillsboro Campus (PDX-01) is in Hillsboro, Oregon. Every tracked Oregon campus, with counts and capacity, is at https://datacenterindex.ai/markets/oregon.
- How big is Aligned Hillsboro Campus (PDX-01)?
- Data Center Index tracks Aligned Hillsboro Campus (PDX-01) at 108 MW. The developer or the press states that capacity, in a source dated January 10, 2023.
- Who is building Aligned Hillsboro Campus (PDX-01)?
- Aligned Data Centers is developing Aligned Hillsboro Campus (PDX-01).
Sources
- Aligned Data Centers Expands into Pacific Northwest with New Hillsboro Campus (aligneddc.com · press · 2023-01-10)
- Data Center Dynamics (datacenterdynamics.com · press · 2026-09-20)
- The Hillsboro Herald (hillsboroherald.com · press · 2026-10-07)