Aligned Ashburn Campus (IAD-01)
180 MW AI data center in Ashburn, VA, United States: operational.
- Capacity: 180 MW
- Location: Ashburn, VA, United States
- Developer: Aligned Data Centers
- Status: operational
Aligned Ashburn Campus (IAD-01) is a 180 MW AI data center project located in Ashburn, VA, United States, currently operational. It is being built by Aligned Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
DEQ permitted Aligned gen-sets at 21890 and 21821 UUNET Drive, Ashburn (2022-07-18, status Operating); Aligned completed phase one of its Ashburn hyperscale campus in 2019.
Related data center projects
- Aligned Project Phoenix (Shippingport), 2.0 GW, Shippingport, PA, United States · under construction
- Project Caprock, 540 MW, Abernathy, TX, United States · under construction
- Aligned IAD-04 Frederick Campus (Quantum Frederick), 264 MW, Frederick, MD, United States · under construction
- Aligned Hillsboro Campus (PDX-01), 108 MW, Hillsboro, OR, United States · under construction
- Aligned Chicago Campus (ORD-01 / ORD-02, Northlake), 100 MW, Northlake, IL, United States · operational
- Aligned Glendale (PHX-13 campus), 72 MW, Glendale, AZ, United States · under construction
- Creekstone Delta Gigasite, 10.0 GW, Delta, UT, United States · under construction
- Stratos Hyperscale Data Center, 9.0 GW, Hansel Valley, UT, United States · announced