Aligned Chicago Campus (ORD-01 / ORD-02, Northlake)
100 MW AI data center in Northlake, IL, United States — operational.
- Capacity: 100 MW
- Location: Northlake, IL, United States
- Developer: Aligned Data Centers
- Status: operational
Aligned Chicago Campus (ORD-01 / ORD-02, Northlake) is a 100 MW AI data center project located in Northlake, IL, United States, currently operational. It is being built by Aligned Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across IL, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Aligned launched ORD-01 (220,000 sq ft, 48 MW expandable to ~60 MW) and broke ground on adjacent ORD-02 in April 2022; at completion the 18.5-acre Northlake campus offers two multi-story facilities totaling 520,000 sq ft and more than 100 MW.
Related data center projects
- Aligned Project Phoenix (Shippingport) — 2.0 GW, Shippingport, PA, United States · under construction
- Project Caprock — 540 MW, Abernathy, TX, United States · under construction
- Aligned IAD-04 Frederick Campus (Quantum Frederick) — 264 MW, Frederick, MD, United States · under construction
- Aligned Hillsboro Campus (PDX-01) — 108 MW, Hillsboro, OR, United States · announced
- Aligned Glendale (PHX-13 campus) — 72 MW, Glendale, AZ, United States · under construction
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted