Meta Huntsville
146 MW AI data center in Huntsville, AL, United States: operational.
- Capacity: 146 MW
- Location: Huntsville, AL, United States
- Developer: Meta
- Status: operational
- Estimated cost: $1.5B
Meta Huntsville is a 146 MW AI data center project located in Huntsville, AL, United States, currently operational. It is being built by Meta. The estimated build cost is $1.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across AL, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 146 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Meta Huntsville
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
- Meta Platforms (META), tenant · hyperscaler
- NextEra Energy (NEE), energy supplier · energy · mid DC exposure
Related data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.1 GW, Perry, OH, United States · announced
- Meta Lebanon Data Center (Project Domino), 1 GW, Lebanon, IN, United States · under construction
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Meta DeKalb Data Center, 800 MW, DeKalb, IL, United States · operational
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Altoona, Iowa AI Data Center Campus, 350 MW, Altoona, IA, United States · operational
Frequently asked questions
- What is Meta Huntsville?
- Meta Huntsville is an AI data center project in Huntsville, Alabama tracked by Data Center Index. Its status is operational.
- Where is Meta Huntsville?
- Meta Huntsville is in Huntsville, Alabama. Every tracked Alabama campus, with counts and capacity, is at https://datacenterindex.ai/markets/alabama.
- How big is Meta Huntsville?
- Data Center Index tracks Meta Huntsville at 146 MW, on an estimated $1.5B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Meta Huntsville?
- Meta is developing Meta Huntsville.
- Which public companies are linked to Meta Huntsville?
- Data Center Index links 3 tracked public companies to Meta Huntsville: Meta Platforms (META), Meta Platforms (META), NextEra Energy (NEE). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Meta Data Centers (info sheet PDF) (datacenters.atmeta.com · press · 2026-10-17)
- Meta Huntsville | AI Data Centers (epoch.ai · aggregator · 2026-09-11)
- Meta (datacenters.atmeta.com · press · 2022-06-09)
- City of Huntsville (huntsvilleal.gov · public record · 2026-10-07)