DC BLOX Birmingham Data Center
60 MW AI data center in Birmingham, AL, United States: operational.
Updated
- Capacity: 60 MW
- Location: Birmingham, AL, United States
- Developer: DC BLOX
- Status: operational
DC BLOX Birmingham Data Center is a 60 MW AI data center project located in Birmingham, AL, United States, currently operational. It was developed by DC BLOX. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Alabama.
Project description
DC BLOX's Birmingham page gives 433 6th Street South, calls it a 31,000 sq ft Tier III certified colocation facility, and lists up to 5MW critical load, expandable up to 60MW. It says the campus is being expanded for wholesale and hyperscale users.
Related data center projects
- DC BLOX Atlanta West (Douglasville), 200 MW, Douglasville, GA, United States · under construction
- DC BLOX Conyers AI Campus, 154 MW, Rockdale County, GA, United States · under construction
- DC BLOX Indianapolis East Side Campus, 52 MW, Indianapolis (Warren Township), IN, United States · permitted
- DC BLOX Myrtle Beach Cable Landing Station (MYR1), 19 MW, Myrtle Beach, SC, United States · operational
- DC BLOX Greenville Data Center, 18 MW, Greenville, SC, United States · operational
- DC BLOX Huntsville Data Center, 14 MW, Huntsville, AL, United States · operational
- DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus, 10 MW, Nashville, TN, United States · announced
- DC BLOX Chattanooga Data Center (CHA1), 4 MW, Chattanooga, TN, United States · operational
Frequently asked questions
- What is DC BLOX Birmingham Data Center?
- DC BLOX Birmingham Data Center is an AI data center project in Birmingham, Alabama tracked by Data Center Index. Its status is operational.
- Where is DC BLOX Birmingham Data Center?
- DC BLOX Birmingham Data Center is in Birmingham, Alabama. Every tracked Alabama campus, with counts and capacity, is at https://datacenterindex.ai/markets/alabama.
- How big is DC BLOX Birmingham Data Center?
- Data Center Index tracks DC BLOX Birmingham Data Center at 60 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building DC BLOX Birmingham Data Center?
- DC BLOX is developing DC BLOX Birmingham Data Center.
Sources
- Birmingham Data Center | DC BLOX (dcblox.com · press · 2026-11-18)