DC BLOX Myrtle Beach Cable Landing Station (MYR1)
19 MW AI data center in Myrtle Beach, SC, United States: operational.
Updated
- Capacity: 19 MW
- Location: Myrtle Beach, SC, United States
- Developer: DC BLOX
- Status: operational
DC BLOX Myrtle Beach Cable Landing Station (MYR1) is a 19 MW AI data center project located in Myrtle Beach, SC, United States, currently operational. It was developed by DC BLOX. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in South Carolina.
Project description
DC BLOX's Myrtle Beach page describes its cable landing station and colocation facility at 1401 Howard Road in the International Technology & Aerospace Park, designed for up to 125,000 sq ft and 19MW of power. The operator's October 14, 2025 release says MYR1 opened in 2023 and a second facility, MYR2, is planned on adjacent land.
Related data center projects
- DC BLOX Atlanta West (Douglasville), 200 MW, Douglasville, GA, United States · under construction
- DC BLOX Conyers AI Campus, 154 MW, Rockdale County, GA, United States · under construction
- DC BLOX Birmingham Data Center, 60 MW, Birmingham, AL, United States · operational
- DC BLOX Indianapolis East Side Campus, 52 MW, Indianapolis (Warren Township), IN, United States · permitted
- DC BLOX Greenville Data Center, 18 MW, Greenville, SC, United States · operational
- DC BLOX Huntsville Data Center, 14 MW, Huntsville, AL, United States · operational
- DC BLOX Nashville (Grassmere Park / Nashville Zoo) Campus, 10 MW, Nashville, TN, United States · announced
- DC BLOX Chattanooga Data Center (CHA1), 4 MW, Chattanooga, TN, United States · operational
Frequently asked questions
- What is DC BLOX Myrtle Beach Cable Landing Station (MYR1)?
- DC BLOX Myrtle Beach Cable Landing Station (MYR1) is an AI data center project in Myrtle Beach, South Carolina tracked by Data Center Index. Its status is operational.
- Where is DC BLOX Myrtle Beach Cable Landing Station (MYR1)?
- DC BLOX Myrtle Beach Cable Landing Station (MYR1) is in Myrtle Beach, South Carolina. Every tracked South Carolina campus, with counts and capacity, is at https://datacenterindex.ai/markets/south-carolina.
- How big is DC BLOX Myrtle Beach Cable Landing Station (MYR1)?
- Data Center Index tracks DC BLOX Myrtle Beach Cable Landing Station (MYR1) at 19 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building DC BLOX Myrtle Beach Cable Landing Station (MYR1)?
- DC BLOX is developing DC BLOX Myrtle Beach Cable Landing Station (MYR1).
Sources
- Myrtle Beach Cable Landing Station | DC BLOX (dcblox.com · press · 2026-11-18)
- DC BLOX (dcblox.com · press · 2026-11-18)