ID AI Data Center Projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
- Projects tracked: 6
- Operating: 1
- Under construction: 1
- Announced / permitted: 4
- Total capacity: 550 MW
- Estimated investment: ~$6.8B
-
TerraVolt Southeast Idaho Campus (Raft River) — 240 MW, Raft River, ID, United States · developer: TerraVolt Infrastructure (CalEthos) · announced
-
Meta Kuna — 200 MW, Kuna ID 83634, ID, United States · developer: Meta · operational · ~$5.8B
-
Deep Atomic INL Nuclear-Powered AI Data Center — 60 MW, Idaho Falls, ID, United States · developer: Deep Atomic · announced
-
Oklo's Aurora Nuclear Powerhouse for AI Data Centers — 50 MW, Arco, ID, United States · developer: Oklo Inc. · announced
-
Gemstone Technology Park, Kuna, ID, United States · developer: Diode Ventures · permitted · ~$1.0B
-
Boise Fab Expansion, Boise, ID, United States · developer: Micron · under construction