Rhea Data (Arevia Power)
Tracked AI data center portfolio for Rhea Data (Arevia Power): live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 600 MW
Projects
- Rhea Data Blacks Creek Campus, 600 MW, Kuna, ID, United States · announced
Frequently asked questions
- How many data centers does Rhea Data (Arevia Power) have?
- Data Center Index tracks 1 data center campus with Rhea Data (Arevia Power) named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Rhea Data (Arevia Power) have?
- 600 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Rhea Data (Arevia Power) campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Rhea Data (Arevia Power) build data centers?
- Tracked Rhea Data (Arevia Power) campuses sit in 1 market: ID (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Rhea Data (Arevia Power) data center?
- Rhea Data Blacks Creek Campus in Kuna, ID is the largest tracked Rhea Data (Arevia Power) campus at 600 MW, currently announced. The developer or the press states that capacity, in a source dated September 22, 2026.