TerraVolt Southeast Idaho Campus (Raft River)
240 MW AI data center in Raft River, ID, United States: announced.
- Capacity: 240 MW
- Location: Raft River, ID, United States
- Developer: TerraVolt Infrastructure (CalEthos)
- Status: announced
TerraVolt Southeast Idaho Campus (Raft River) is a 240 MW AI data center project located in Raft River, ID, United States, currently announced. It is being built by TerraVolt Infrastructure (CalEthos). This project is one of thousands of data-center facilities tracked by Data Center Index across ID, United States, covering operational, under-construction, announced, and permitted sites.
Project description
TerraVolt signed a firm gas supply deal for 55,000 MMBtu/day for a behind-the-meter plant. It'll power the initial 200 to 240 MW phase of TerraVolt's master-planned Southeast Idaho campus on the Northwest Pipeline.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is TerraVolt Southeast Idaho Campus (Raft River)?
- TerraVolt Southeast Idaho Campus (Raft River) is an AI data center project in Raft River, Idaho tracked by Data Center Index. Its status is announced.
- Where is TerraVolt Southeast Idaho Campus (Raft River)?
- TerraVolt Southeast Idaho Campus (Raft River) is in Raft River, Idaho. Every tracked Idaho campus, with counts and capacity, is at https://datacenterindex.ai/markets/idaho.
- How big is TerraVolt Southeast Idaho Campus (Raft River)?
- Data Center Index tracks TerraVolt Southeast Idaho Campus (Raft River) at 240 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building TerraVolt Southeast Idaho Campus (Raft River)?
- TerraVolt Infrastructure (CalEthos) is developing TerraVolt Southeast Idaho Campus (Raft River).
Sources
- TerraVolt inks natural gas supply deal for onsite power plant at planned data center campus in Idaho (datacenterdynamics.com · press · 2026-05-12)
- SEC EDGAR (CalEthos Inc. 8-K Exhibit 99.1) (sec.gov · filing · 2026-05-11)
- TerraVolt Holdings 10-Q (September 2026) (sec.gov · filing · 2026-09-12)
- Pipeline & Gas Journal (pgjonline.com · press · 2026-05-11)