TerraVolt Southeast Idaho Campus (Raft River)
240 MW AI data center in Raft River, ID, United States — announced.
- Capacity: 240 MW
- Location: Raft River, ID, United States
- Developer: TerraVolt Infrastructure (CalEthos)
- Status: announced
TerraVolt Southeast Idaho Campus (Raft River) is a 240 MW AI data center project located in Raft River, ID, United States, currently announced. It is being built by TerraVolt Infrastructure (CalEthos). This project is one of thousands of data-center facilities tracked by Data Center Index across ID, United States — covering operational, under-construction, announced, and permitted sites.
Project description
TerraVolt signed a firm 55,000 MMBtu/day gas supply deal for a behind-the-meter plant to power the initial 200-240 MW phase of its master-planned Southeast Idaho campus on the Northwest Pipeline.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted