TerraVolt Infrastructure (CalEthos)

Tracked AI data center portfolio for TerraVolt Infrastructure (CalEthos): live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does TerraVolt Infrastructure (CalEthos) have?
Data Center Index tracks 1 data center campus with TerraVolt Infrastructure (CalEthos) named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does TerraVolt Infrastructure (CalEthos) have?
240 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 TerraVolt Infrastructure (CalEthos) campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does TerraVolt Infrastructure (CalEthos) build data centers?
Tracked TerraVolt Infrastructure (CalEthos) campuses sit in 1 market: ID (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest TerraVolt Infrastructure (CalEthos) data center?
TerraVolt Southeast Idaho Campus (Raft River) in ID is the largest tracked TerraVolt Infrastructure (CalEthos) campus at 240 MW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.