Terra Nexus
Tracked AI data center portfolio for Terra Nexus: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 460 MW
Projects
- Terra Nexus Old Cheraw Highway Data Center, 460 MW, Rockingham, NC, United States · permitted
Frequently asked questions
- How many data centers does Terra Nexus have?
- Data Center Index tracks 1 data center campus with Terra Nexus named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Terra Nexus have?
- 460 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Terra Nexus campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Terra Nexus build data centers?
- Tracked Terra Nexus campuses sit in 1 market: NC (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Terra Nexus data center?
- Terra Nexus Old Cheraw Highway Data Center in Rockingham, NC is the largest tracked Terra Nexus campus at 460 MW, currently permitted. The developer or the press states that capacity, in a source dated September 15, 2026.