How many data centers does PointOne Data Centers have?
Data Center Index tracks 1 data center campus with PointOne Data Centers named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does PointOne Data Centers have?
90 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 PointOne Data Centers campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does PointOne Data Centers build data centers?
Tracked PointOne Data Centers campuses sit in 1 market: NC (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest PointOne Data Centers data center?
PointOne / CyrusOne Sanford Campus (Lower Moncure Road) in NC is the largest tracked PointOne Data Centers campus at 90 MW, currently announced. The developer or the press states that capacity, in a source dated July 15, 2026.