TeraWulf (WULF)
Bitcoin miner turned builder of AI and high-performance computing data centers powered mainly by low-carbon energy, including the Lake Mariner campus in New York.
- Type: Bitcoin miner moving into AI hosting
- Ownership: Public company (WULF)
- Headquarters: Easton, MD
- Founded: 2021
- Website: terawulf.com
- Ticker: WULF
- Projects tracked: 4
- Total pipeline: 3.2 GW
Projects
- TeraWulf Muskie Data Campus, 1 GW, Ashland, KY, United States · announced
- TeraWulf Chesapeake Data Campus (Morgantown Generating Station), 1 GW, Newburg, MD, United States · announced
- TeraWulf Lake Mariner Campus, 750 MW, Barker, NY, United States · operational
- TeraWulf Justified Data Campus, 401 MW, Hawesville, KY, United States · announced
- TeraWulf Cayuga Data Campus (Lake Hawkeye), 400 MW, Lansing, NY, United States · paused
Frequently asked questions
- How many data centers does TeraWulf have?
- Data Center Index tracks 4 data center campuses with TeraWulf named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does TeraWulf have?
- 3.2 GW across 4 tracked campuses, counting operating and pipeline sites together. Of the 4 TeraWulf campuses with a capacity figure, 0 are filed, 3 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does TeraWulf build data centers?
- Tracked TeraWulf campuses sit in 3 markets: KY (2), MD (1), NY (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest TeraWulf data center?
- TeraWulf Muskie Data Campus in Ashland, KY is the largest tracked TeraWulf campus at 1 GW, currently announced. The developer or the press states that capacity, in a source dated June 19, 2026.