TeraWulf (WULF)

Bitcoin miner turned builder of AI and high-performance computing data centers powered mainly by low-carbon energy, including the Lake Mariner campus in New York.

Projects

Frequently asked questions

How many data centers does TeraWulf have?
Data Center Index tracks 4 data center campuses with TeraWulf named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does TeraWulf have?
3.2 GW across 4 tracked campuses, counting operating and pipeline sites together. Of the 4 TeraWulf campuses with a capacity figure, 0 are filed, 3 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does TeraWulf build data centers?
Tracked TeraWulf campuses sit in 3 markets: KY (2), MD (1), NY (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest TeraWulf data center?
TeraWulf Muskie Data Campus in Ashland, KY is the largest tracked TeraWulf campus at 1 GW, currently announced. The developer or the press states that capacity, in a source dated June 19, 2026.

Profile sources