TeraWulf Cayuga Data Campus (Lake Hawkeye)
400 MW AI data center in Lansing, NY, United States — announced.
- Capacity: 400 MW
- Location: Lansing, NY, United States
- Developer: TeraWulf
- Status: announced
TeraWulf Cayuga Data Campus (Lake Hawkeye) is a 400 MW AI data center project located in Lansing, NY, United States, currently announced. It is being built by TeraWulf. This project is one of thousands of data-center facilities tracked by Data Center Index across NY, United States — covering operational, under-construction, announced, and permitted sites.
Project description
80-year ground lease on ~183 acres at the former Cayuga coal plant in Lansing with exclusive rights to develop up to 400 MW of digital infrastructure; 138 MW of power was expected ready for service in 2026.
Related data center projects
- TeraWulf Muskie Data Campus — 1.0 GW, Ashland, KY, United States · announced
- TeraWulf Chesapeake Data Campus (Morgantown Generating Station) — 1.0 GW, Newburg, MD, United States · announced
- TeraWulf Justified Data Campus — 401 MW, Hawesville, KY, United States · announced
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction