5C Group
AI data center and GPU cloud provider formed in April 2025 when Hypertec Cloud acquired 5C Data Centers; builds and operates AI-focused campuses in the US, including Memphis and Columbus.
- Type: Colocation provider
- Ownership: Private company
- Founded: 2025
- Website: 5c.ai
- Projects tracked: 2
- Total pipeline: 159 MW
Projects
- 5C MEM01 Memphis (former Fred's HQ), 84 MW, Memphis, TN, United States · operational
- 5C Springfield AI Data Center (Vultr), 75 MW, Springfield, OH, United States · under construction
Frequently asked questions
- How many data centers does 5C Group have?
- Data Center Index tracks 2 data center campuses with 5C Group named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does 5C Group have?
- 159 MW across 2 tracked campuses, counting operating and pipeline sites together. Of the 2 5C Group campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does 5C Group build data centers?
- Tracked 5C Group campuses sit in 2 markets: OH (1), TN (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest 5C Group data center?
- 5C MEM01 Memphis (former Fred's HQ) in TN is the largest tracked 5C Group campus at 84 MW, currently operational. The developer or the press states that capacity, in a source dated October 19, 2026.