5C Group

AI data center and GPU cloud provider formed in April 2025 when Hypertec Cloud acquired 5C Data Centers; builds and operates AI-focused campuses in the US, including Memphis and Columbus.

Projects

Frequently asked questions

How many data centers does 5C Group have?
Data Center Index tracks 2 data center campuses with 5C Group named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does 5C Group have?
159 MW across 2 tracked campuses, counting operating and pipeline sites together. Of the 2 5C Group campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does 5C Group build data centers?
Tracked 5C Group campuses sit in 2 markets: OH (1), TN (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest 5C Group data center?
5C MEM01 Memphis (former Fred's HQ) in TN is the largest tracked 5C Group campus at 84 MW, currently operational. The developer or the press states that capacity, in a source dated October 19, 2026.

Profile sources