NV AI Data Center Projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
- Projects tracked: 10
- Operating: 6
- Under construction: 3
- Announced / permitted: 1
- Total capacity: 2.9 GW
- Estimated investment: ~$10.7B
-
Copia Power Monarch (Mason Valley) — 1.0 GW, Yerington, NV, United States · developer: Copia Power · permitted
-
Switch Citadel Campus (Tahoe Reno) — 650 MW, McCarran, NV, United States · developer: Switch · operational
-
Switch The Core Campus (Las Vegas) — 495 MW, Las Vegas, NV, United States · developer: Switch · operational
-
Vantage Nevada AI Data Center (NV1) — 224 MW, McCarran, NV, United States · developer: Vantage Data Centers · under construction
-
EdgeCore Reno (TRIC) — 216 MW, McCarran, NV, United States · developer: EdgeCore Digital Infrastructure · under construction
-
Fleet Data Centers South Valley (TRIC) — 200 MW, McCarran, NV, United States · developer: Fleet Data Centers (Tract) · under construction · ~$4.6B
-
Novva North Las Vegas — 100 MW, North Las Vegas, NV, United States · developer: Novva Data Centers · operational
-
Novva Tahoe Reno — 60 MW, McCarran, NV, United States · developer: Novva Data Centers · operational
-
Google Storey County, McCarran, NV, United States · developer: Google · operational · ~$6.1B
-
Google Henderson, Henderson, NV, United States · developer: Google · operational