Switch Citadel Campus (Tahoe Reno)
650 MW AI data center in McCarran, NV, United States: operational.
- Capacity: 650 MW
- Location: McCarran, NV, United States
- Developer: Switch
- Status: operational
Switch Citadel Campus (Tahoe Reno) is a 650 MW AI data center project located in McCarran, NV, United States, currently operational. It is being built by Switch. This project is one of thousands of data-center facilities tracked by Data Center Index across NV, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Switch describes its Citadel Campus at Tahoe Reno as a multi-gigawatt expansion and says it will have gigawatts of power capacity when it's complete.
Related data center projects
- Switch The Core Campus (Las Vegas), 495 MW, Las Vegas, NV, United States · operational
- Switch Grand Rapids (The Pyramid Campus), 320 MW, Gaines Township, MI, United States · operational
- Switch Big Beaver Campus (former Pitt Race), Big Beaver Borough, PA, United States · announced
- Switch KEEP 2.0 Atlanta North (Cartersville), Cartersville, GA, United States · permitted
- Switch Atlanta (The KEEP), Lithia Springs, GA, United States · operational
- Switch Transwestern Data Ranch Campus, Austin, TX, United States · permitted
- Switch Apex Campus (North Las Vegas), North Las Vegas, NV, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
Frequently asked questions
- What is Switch Citadel Campus (Tahoe Reno)?
- Switch Citadel Campus (Tahoe Reno) is an AI data center project in McCarran, Nevada tracked by Data Center Index. Its status is operational.
- Where is Switch Citadel Campus (Tahoe Reno)?
- Switch Citadel Campus (Tahoe Reno) is in McCarran, Nevada. Every tracked Nevada campus, with counts and capacity, is at https://datacenterindex.ai/markets/nevada.
- How big is Switch Citadel Campus (Tahoe Reno)?
- Data Center Index tracks Switch Citadel Campus (Tahoe Reno) at 650 MW. The developer or the press states that capacity, in a source dated October 7, 2026.
- Who is building Switch Citadel Campus (Tahoe Reno)?
- Switch is developing Switch Citadel Campus (Tahoe Reno).
Sources
- Tahoe Reno Data Center | Citadel Campus | Switch (switch.com · press · 2026-09-11)
- Data Center Knowledge (datacenterknowledge.com · press · 2017-02-15)
- Data Center Frontier (datacenterfrontier.com · press · 2017-02-15)
- Switch (switchdotcom.s3-sites.data.switch.com · press · 2024-05-01)
- PR Newswire (Switch release) (prnewswire.com · press · 2017-02-15)
- switch.com (press · 2017-02-15)
- Switch (switch.com · press · 2024-05-01)