Switch The Core Campus (Las Vegas)
495 MW AI data center in Las Vegas, NV, United States: operational.
- Capacity: 495 MW
- Location: Las Vegas, NV, United States
- Developer: Switch
- Status: operational
Switch The Core Campus (Las Vegas) is a 495 MW AI data center project located in Las Vegas, NV, United States, currently operational. It is being built by Switch. This project is one of thousands of data-center facilities tracked by Data Center Index across NV, United States, covering operational, under-construction, announced, and permitted sites.
Project description
The Core is Switch's home campus in Las Vegas, which the company rates Tier 5 Platinum and says will have up to 495 MW of power once complete. Switch runs it on renewable energy and links it to its Citadel campus over a dedicated fiber route it puts at 7 ms.
Related data center projects
- Switch Citadel Campus (Tahoe Reno), 650 MW, McCarran, NV, United States · operational
- Switch Grand Rapids (The Pyramid Campus), 320 MW, Gaines Township, MI, United States · operational
- Switch Big Beaver Campus (former Pitt Race), Big Beaver Borough, PA, United States · announced
- Switch KEEP 2.0 Atlanta North (Cartersville), Cartersville, GA, United States · permitted
- Switch Atlanta (The KEEP), Lithia Springs, GA, United States · operational
- Switch Transwestern Data Ranch Campus, Austin, TX, United States · permitted
- Switch Apex Campus (North Las Vegas), North Las Vegas, NV, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
Frequently asked questions
- What is Switch The Core Campus (Las Vegas)?
- Switch The Core Campus (Las Vegas) is an AI data center project in Las Vegas, Nevada tracked by Data Center Index. Its status is operational.
- Where is Switch The Core Campus (Las Vegas)?
- Switch The Core Campus (Las Vegas) is in Las Vegas, Nevada. Every tracked Nevada campus, with counts and capacity, is at https://datacenterindex.ai/markets/nevada.
- How big is Switch The Core Campus (Las Vegas)?
- Data Center Index tracks Switch The Core Campus (Las Vegas) at 495 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Switch The Core Campus (Las Vegas)?
- Switch is developing Switch The Core Campus (Las Vegas).
Sources
- Las Vegas Data Center | Nevada Colocation | Switch (switch.com · press · 2026-10-25)
- Data Center Frontier (datacenterfrontier.com · press · 2017-06-15)
- 102.7 Coyote Country (coyotecountrylv.com · press · 2026-09-25)
- FOX5 Vegas (fox5vegas.com · press · 2017-06-15)