Switch The Core Campus (Las Vegas)
495 MW AI data center in Las Vegas, NV, United States — under construction.
- Capacity: 495 MW
- Location: Las Vegas, NV, United States
- Developer: Switch
- Status: under construction
Switch The Core Campus (Las Vegas) is a 495 MW AI data center project located in Las Vegas, NV, United States, currently under construction. It is being built by Switch. This project is one of thousands of data-center facilities tracked by Data Center Index across NV, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Switch says The Core campus in Las Vegas will have up to 495 MW of power upon completion.
Related data center projects
- Switch Big Beaver Campus (former Pitt Race) — 270 MW, Big Beaver Borough, PA, United States · announced
- Switch Citadel Campus (Tahoe Reno), McCarran, NV, United States · under construction
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced