Designs, builds and operates large colocation data center campuses in the US. Taken private by DigitalBridge and IFM Investors in 2022.
- Type: Colocation provider
- Ownership: Private, backed by DigitalBridge and IFM Investors
- Headquarters: Las Vegas, NV
- Founded: 2000
- Website: switch.com
- Projects tracked: 8
- Total pipeline: 1.5 GW
Projects
- Switch Citadel Campus (Tahoe Reno), 650 MW, Storey County, NV, United States · operational
- Switch The Core Campus (Las Vegas), 495 MW, Clark County, NV, United States · operational
- Switch Grand Rapids (The Pyramid Campus), 320 MW, Gaines Township, MI, United States · operational
- Switch Big Beaver Campus (former Pitt Race), Big Beaver Borough, PA, United States · announced
- Switch KEEP 2.0 Atlanta North (Cartersville), Cartersville, GA, United States · permitted
- Switch Atlanta (The KEEP), Lithia Springs, GA, United States · operational
- Switch Transwestern Data Ranch Campus, Austin, TX, United States · permitted
- Switch Apex Campus (North Las Vegas), North Las Vegas, NV, United States · announced
Frequently asked questions
- How many data centers does Switch have?
- Data Center Index tracks 8 data center campuses with Switch named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Switch have?
- 1.5 GW across 8 tracked campuses, counting operating and pipeline sites together. Of the 3 Switch campuses with a capacity figure, 0 are filed, 0 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Switch build data centers?
- Tracked Switch campuses sit in 5 markets: NV (3), GA (2), MI (1), PA (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Switch data center?
- Switch Citadel Campus (Tahoe Reno) in Storey County, NV is the largest tracked Switch campus at 650 MW, currently operational. That capacity is an estimate. We modeled or inferred it, and no source states it.