Switch Grand Rapids (The Pyramid Campus)
320 MW AI data center in Gaines Township, MI, United States: operational.
- Capacity: 320 MW
- Location: Gaines Township, MI, United States
- Developer: Switch
- Status: operational
Switch Grand Rapids (The Pyramid Campus) is a 320 MW AI data center project located in Gaines Township, MI, United States, currently operational. It is being built by Switch. This project is one of thousands of data-center facilities tracked by Data Center Index across MI, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Switch opened its Grand Rapids campus in the converted Steelcase Pyramid in Gaines Township, Kent County, Michigan in March 2017. The developer states the campus is designed for up to 1.8 million square feet of data center space and up to 320 MW of power; the first phase carried over 225,000 sq ft of data center space plus a 471,248 sq ft second building. The campus is live and has been adding buildings since.
Related data center projects
- Switch Citadel Campus (Tahoe Reno), 650 MW, Storey County, NV, United States · operational
- Switch The Core Campus (Las Vegas), 495 MW, Clark County, NV, United States · operational
- Switch Big Beaver Campus (former Pitt Race), Big Beaver Borough, PA, United States · announced
- Switch KEEP 2.0 Atlanta North (Cartersville), Cartersville, GA, United States · permitted
- Switch Atlanta (The KEEP), Lithia Springs, GA, United States · operational
- Switch Transwestern Data Ranch Campus, Austin, TX, United States · permitted
- Switch Apex Campus (North Las Vegas), North Las Vegas, NV, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
Frequently asked questions
- What is Switch Grand Rapids (The Pyramid Campus)?
- Switch Grand Rapids (The Pyramid Campus) is an AI data center project in Gaines Township, Michigan tracked by Data Center Index. Its status is operational.
- Where is Switch Grand Rapids (The Pyramid Campus)?
- Switch Grand Rapids (The Pyramid Campus) is in Gaines Township, Michigan. Every tracked Michigan campus, with counts and capacity, is at https://datacenterindex.ai/markets/michigan.
- How big is Switch Grand Rapids (The Pyramid Campus)?
- Data Center Index tracks Switch Grand Rapids (The Pyramid Campus) at 320 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Switch Grand Rapids (The Pyramid Campus)?
- Switch is developing Switch Grand Rapids (The Pyramid Campus).
Sources
- Switch GRAND RAPIDS Now Open: The Largest, Most Advanced Data Center Campus in the Eastern U.S. (prnewswire.com · press · 2017-03-09)
- MLive via CFN (cfn.news · press · 2026-10-07)