Switch Big Beaver Campus (former Pitt Race)

AI data center in Big Beaver Borough, PA, United States: announced.

Switch Big Beaver Campus (former Pitt Race) is a AI data center project located in Big Beaver Borough, PA, United States, currently announced. It is being built by Switch. This project is one of thousands of data-center facilities tracked by Data Center Index across PA, United States, covering operational, under-construction, announced, and permitted sites.

Project description

Switch filed plans with Big Beaver Borough for three 201,690 sq ft data center buildings on the 382-acre former Pittsburgh International Race Complex. The plans include 270 MW of backup generator capacity and a new FirstEnergy switching station on existing 345 kV lines. Phase 1 is set for January 2028, with all three buildings by January 2030.

Related data center projects

Frequently asked questions

What is Switch Big Beaver Campus (former Pitt Race)?
Switch Big Beaver Campus (former Pitt Race) is an AI data center project in Big Beaver Borough, Pennsylvania tracked by Data Center Index. Its status is announced.
Where is Switch Big Beaver Campus (former Pitt Race)?
Switch Big Beaver Campus (former Pitt Race) is in Big Beaver Borough, Pennsylvania. Every tracked Pennsylvania campus, with counts and capacity, is at https://datacenterindex.ai/markets/pennsylvania.
Who is building Switch Big Beaver Campus (former Pitt Race)?
Switch is developing Switch Big Beaver Campus (former Pitt Race).
When will Switch Big Beaver Campus (former Pitt Race) come online?
The next building at Switch Big Beaver Campus (former Pitt Race) is expected online 2030. That date is the first building going live, not the full build-out.

Sources

  1. Switch files to develop data center on former Pittsburgh race track (datacenterdynamics.com · press · 2026-08-24)
  2. Beaver County Radio (beavercountyradio.com · press · 2026-08-20)
  3. Switch (switch.com · press · 2026-10-07)