Google Midlothian
103 MW AI data center in Midlothian, TX, United States: operational.
- Capacity: 103 MW
- Location: Midlothian, TX, United States
- Developer: Google
- Status: operational
- Estimated cost: $3.9B
Google Midlothian is a 103 MW AI data center project located in Midlothian, TX, United States, currently operational. It is being built by Google. The estimated build cost is $3.9B. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 103 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Google Midlothian
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL), developer · hyperscaler
Related data center projects
- Google Project Tembo (Cheyenne), 1.8 GW, Cheyenne, WY, United States · permitted
- EcoDataCenter 1, 1 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa), 1 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus, 800 MW, Vernon, TX, United States · under construction
- Google West Memphis Data Center, 600 MW, West Memphis, AR, United States · under construction
- Google Fredericia (Taulov) AI Data Center, 550 MW, Fredericia, Denmark · operational
- Google-Kairos Power AI Data Center Initiative, 500 MW, Oak Ridge, TN, United States · announced
- Haskell County Campus, 440 MW, Haskell, TX, United States · under construction
Frequently asked questions
- What is Google Midlothian?
- Google Midlothian is an AI data center project in Midlothian, Texas tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- Where is Google Midlothian?
- Google Midlothian is in Midlothian, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- How big is Google Midlothian?
- Data Center Index tracks Google Midlothian at 103 MW, on an estimated $3.9B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Google Midlothian?
- Google is developing Google Midlothian.
- When will Google Midlothian come online?
- Google Midlothian is already operating. The next building is expected to go live 2027-02.
- Which public companies are linked to Google Midlothian?
- Data Center Index links 1 tracked public company to Google Midlothian: Alphabet (GOOGL). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Google files for fifth data center at Midlothian campus in Texas (datacenterdynamics.com · press · 2026-03-03)
- Google Data Centers (official) (datacenters.google · press · 2026-09-20)
- TCEQ Permit Search: RN110495884 SHARKA (permit-search.tceq.texas.gov · public record · 2024-10-25)
- The Real Deal (therealdeal.com · press · 2026-09-12)
- FOX 4 News (KDFW, Dallas) (fox4news.com · press · 2026-09-12)