Bitcoin miner turned AI cloud provider that owns its data centers, grid connections and GPUs. Formerly Iris Energy; renamed IREN Limited in November 2024.

Projects

Frequently asked questions

How many data centers does IREN have?
Data Center Index tracks 3 data center campuses with IREN named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does IREN have?
3.8 GW across 3 tracked campuses, counting operating and pipeline sites together. Of the 3 IREN campuses with a capacity figure, 0 are filed, 0 stated and 3 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does IREN build data centers?
Tracked IREN campuses sit in 2 markets: TX (2), OK (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest IREN data center?
IREN Project Emerald (Kiowa) in Pittsburg County, OK is the largest tracked IREN campus at 1.6 GW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.