Childress Campus
300 MW AI data center in Childress, TX, United States — under construction.
- Capacity: 300 MW
- Location: Childress, TX, United States
- Developer: IREN
- Status: under construction
- Estimated cost: $1.5B
Childress Campus is a 300 MW AI data center project located in Childress, TX, United States, currently under construction. It is being built by IREN. The estimated build cost is $1.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Childress Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- IREN (IREN) — developer · gpu cloud · high DC exposure
- Generac (GNRC) — genset · power equipment · mid DC exposure
Related data center projects
- Sweetwater Campus — 600 MW, Sweetwater, TX, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- AWS Project Rainier (New Carlisle, Indiana) — 2.4 GW, New Carlisle, IN, United States · operational
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · operational
- Diablo Canyon AI Integration Project — 2.3 GW, Avila Beach, United States · operational