Childress Campus
750 MW AI data center in Childress, TX, United States: operational.
- Capacity: 750 MW
- Location: Childress, TX, United States
- Developer: IREN
- Status: operational
- Estimated cost: $1.5B
Childress Campus is a 750 MW AI data center project located in Childress, TX, United States, currently operational. It is being built by IREN. The estimated build cost is $1.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.
Project description
IREN's Childress campus in the Texas Panhandle is a 750 MW site on a 576-acre freehold, connected directly to the ERCOT grid through IREN's own substations. Generac is linked on backup power, and together with Sweetwater it's the core of IREN's AI infrastructure pivot.
Public companies linked to Childress Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- IREN (IREN), developer · gpu cloud · high DC exposure
- Generac (GNRC), genset · power equipment · mid DC exposure
Related data center projects
- Sweetwater Campus, 2 GW, Sweetwater, TX, United States · under construction
- IREN Project Emerald (Kiowa), 1.2 GW, Kiowa, OK, United States · announced
- Stratos Hyperscale Data Center, 9 GW, Snowville, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
Frequently asked questions
- What is Childress Campus?
- Childress Campus is an AI data center project in Childress, Texas tracked by Data Center Index. Its status is operational.
- Where is Childress Campus?
- Childress Campus is in Childress, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- How big is Childress Campus?
- Data Center Index tracks Childress Campus at 750 MW, on an estimated $1.5B build. The developer or the press states that capacity, in a source dated September 21, 2026.
- Who is building Childress Campus?
- IREN is developing Childress Campus.
- Which public companies are linked to Childress Campus?
- Data Center Index links 2 tracked public companies to Childress Campus: IREN (IREN), Generac (GNRC). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- IREN (project page) (iren.com · press · 2026-09-21)
- GlobeNewswire (IREN press release) (globenewswire.com · press · 2026-09-12)