Data center projects — state=TX
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
-
OpenAI Stargate Shackelford — 2.0 GW, Abilene, TX, United States (Oracle) · operational
-
Frontier Campus — 1.4 GW, TX, United States (Vantage) · under construction
-
Stargate I — 1.2 GW, Abilene, TX, United States (Crusoe) · under construction
-
OpenAI Stargate Milam — 1.2 GW, TX, United States (Softbank) · operational
-
OpenAI Stargate Abilene — 1.2 GW, Abilene, TX, United States (Oracle) · operational
-
Goodnight — 1.1 GW, Claude, TX, United States (Google) · operational
-
Goodnight Campus — 1.0 GW, Claude, TX, United States (Crusoe) · under construction
-
El Paso DC — 1.0 GW, El Paso, TX, United States (Meta) · operational
-
Crusoe Abilene Expansion — 941 MW, Abilene, TX, United States (Microsoft) · operational
-
Wilbarger Campus — 800 MW, Vernon, TX, United States (Google) · announced
-
Coreweave Helios — 800 MW, Afton, TX, United States (Coreweave) · operational
-
Sweetwater Campus — 600 MW, Sweetwater, TX, United States (IREN) · under construction
-
Haskell County Campus — 440 MW, TX, United States (Google) · announced
-
CoreWeave Denton TX — 367 MW, Denton, TX, United States (CoreWeave) · operational
-
Childress Campus — 300 MW, Childress, TX, United States (IREN) · under construction
-
Microsoft — San Antonio, Texas AI Data Center Campus — 300 MW, San Antonio, TX, United States (Microsoft) · operational
-
Meta Temple — 238 MW, Temple, TX, United States (Meta) · operational
-
Garland Campus — 200 MW, Dallas, TX, United States (Digital Realty) · under construction
-
Taylor Fab, Taylor, TX, United States (Samsung) · under construction
-
Stargate Shackelford County, Shackelford County, TX, United States (Oracle) · announced